| Overhead Crane Introduction | p 506 | Lowering a Load | p 553,554 | | ANSI Standards | p 506 | Inching a Load | p 554,555 | | CMAA Classifications | p 507 | Coordinated Movements | p 556-559 | | Indoor Cranes & Hoists | p 507-512 | Swinging Loads | p 557-559 | | Outdoor Cranes | p 512,513 | Crane Signals | p 559,560 | | Straddle Lift Gantry | p 513-515 | Hoisting With Magnet | p 561,562 | | Overhead Crane Components | p 516-520 | Hoist Assembly | p 563-573 | | Crane Terminology | p 518-520 | Limit Switches | p 566-570 | | Power to Crane | p 521,522 | Hoist Brakes | p 570,571 | | Crane Controls | p 521 | Overload Protection | p 571-573 | | Digital Controls | p 523,524 | Pre-operation Inspection | p 573-575 | | Remote Radio Controls | p 524-535 | Operator Awareness | p 576,577 | | Pendant Controls | p 536-538 | Safety Summary | p 577-579 | | Cab Controls | p 539-560 | Housekeeping & Hazards | p 580 | | Crane Bridge | p 540-546 | Lockout & Inspection | p 581-586 | | Crane Trolley | p 546-550 | Crane Testing | p 587-591 | | Crane Hoist | p 551-560 | Crane Securing | p 592 | | Lifting a Load | p 551,552 | | | |
|
|
|
|